Project |
Name |
9812 |
Lockheed/Martin Astronautics |
9814 |
Remodel Medical Clinic-Phase II (M-1A) |
ADDITIONAL PROJECTS COMPLETED
Project: |
9727 |
Name: |
Morgen Building |
Location: |
Brighton, Colorado |
Owner: |
C. Morgen Masonry |
Architect/Engineer: |
Parkhill Ivins |
|
1475 Lawrence, Suite
300 |
|
Denver, Colorado
80202 |
|
303-466-8030 |
Contract Amount: |
$340,000 |
Completion Date: |
January 1998 |
Project Scope:
This project consists of a one storey, 3000 square
foot, split face masonry building for a mason constracto. Work consists
of sitework, concrete foundations, masonry structure, wood roof framing,
asphault shingles, interior finishes, specialities, plumbing, HVAC, electrical,
and other realated work to produce a complete building.
Project: |
9721 |
Name: |
PARKER CONVEYOR |
Location: |
Parker, Colorado |
Owner: |
Town of Parker |
Contract Amount: |
$10,800 |
Completion Date: |
May, 1997 |
Project Scope:
Repair, paint and replacement of worn parts on
grit conveyor parts supplied by owner.
Project: |
9720 |
Name: |
AIRTOUCH CELLULAR
BATTERY ROOM ADDITION |
Location: |
Englewood, Colorado |
Owner: |
AirTouch Cellular |
Architect/Engineer: |
Encompass, inc. |
|
2850 Metro Drive,
Suite 523 |
|
Bloomington, MN 55425 |
Contract Amount: |
$53,695.00 |
Completion Date: |
July, 1997 |
Project Scope:
Expand backup battery room in an existing control/switching
facility. Wall construction, HVAC, and electrical renovation, structural
reinforcing of the precast concrete floor.
Project: |
9717 |
Name: |
BETASSO WTP |
Location: |
Boulder, Colorado |
Owner: |
City of Boulder |
Contract Amount: |
$3,500.00 |
Completion Date: |
April, 1997 |
Project Scope:
Demolition and removal of existing alum tanks.
Project: |
9716 |
Name: |
GLENDALE ULTRAVIOLET
SYSTEM |
Location: |
Glendale, Colorado |
Owner: |
City of Glendale |
Architect/Engineer: |
Black & Veatch |
|
11900 East Cornell
Avenue |
|
Aurora, Colorado
80114 |
|
Ms. Anne Childs |
Contract Amount: |
$98,435.00 |
Completion Date: |
September 1997 |
Project Scope:
Addition of a new ultravoilet disinfection system
in the effluent channel of the chlorine contact basin. Replacement of the
existing effluent flow measurement system. The effluent flow measurement
system will consist of a mafnetic flowmeter and flow transmitter. Addition
of grating over effluent channel and chlorine contact basin. Addition of
a concrete pad and drain line to provide for cleaning the disinfectio equipment.
Asphalt demolition and repalcement as required for new concrete pad and
electrical and lighting additions. Addition of a sunshade over the new
ultravoilet disinfection system. Modifications to the existing light pole
and the addition of lighting on the sunshade.
Project: |
9713 |
Name: |
T-28 Containment
Basins |
Location: |
Littleton, Colorado |
Owner: |
Lockheed Martin Astronautics |
Architect/Engineer: |
Lockheed Martin Facilities |
Contract Amount: |
$154,453.00 |
Completion Date: |
May, 1997 |
Project Scope:
Replace protective coating on an existing containment
area at a missile test stand.
Project: |
9710 |
Name: |
Refurbish Earth
Berms |
Location: |
Littleton, Colorado |
Owner: |
Lockheed Martin Astronautics |
Architect/Engineer: |
Lockheed Martin Facilities |
Contract Amount: |
$42,242.00 |
Completion Date: |
April, 1997 |
Project Scope:
Regrade and shotcrete earth berms located between
explosive storage magazines, the work included dirtwork and grading, shotcrete
and seeding.
Project: |
9709 |
Name: |
TRIBUTARY DENVER
WELLS 7,8,9 and 10 |
|
ARAPAHOE WELL
12 |
Location: |
Highlands Ranch,
Colorado |
Owner: |
Centennial Water
and Sanitation District |
|
62 West Plaza Drive |
|
Highlands Ranch,
Colorado 80126 |
Architect/Engineer: |
CH2M Hill |
Contract Amount: |
$496,911.00 |
Completion Date: |
June, 1997 |
Project Scope:
Install well monitoring and control vaults, associated
yard and interior piping, install owner furnished well pump equipment,
dirtwork and grading, roadbase and fencing.
Project: |
9708 |
Name: |
Filter Gulch Emergency
Diversion System |
Location: |
Littleton, Colorado |
Owner: |
Lockheed Martin Astronautics |
Architect/Engineer: |
Lockheed Martin Facilities |
Contract Amount: |
$102,074.80 |
Completion Date: |
April, 1997 |
Project Scope:
Installation of pipe lining on corroded culvert
piping, grouted rip rap, gabion baskets, headwall and slabs.
Project: |
9707 |
Name: |
WEST LAB VENTILATION |
Location: |
Littleton, Colorado |
Owner: |
Lockheed Martin Astronautics |
Architect/Engineer: |
Lockheed Martin Facilities |
Contract Amount: |
$290,568 |
Completion Date: |
April, 1997 |
Project Scope:
Demolition of existing and replace ventilation
equipment and add a new mechanical room.
Project: |
9706 |
Name: |
SPRINT CELL SITES |
|
Haynes Mechanical |
Location: |
Greenwood Village,
Colorado |
Owner: |
Sprint Spectrum |
Architect/Engineer: |
Bechtel National |
Contract Amount: |
$125,000 |
Completion Date: |
April, 1997 |
Project Scope:
Rooftop mounted steel, coax cable, architectural
false chimneys and penthouse enclosures on an existing building.
Project: |
9705 |
Name: |
SPRINT CELL SITES |
|
Turnpike Tower |
Location: |
Westminster, Colorado |
Owner: |
Sprint Spectrum |
Architect/Engineer: |
Bechtel National |
Contract Amount: |
$70,000 |
Completion Date: |
April, 1997 |
Project Scope:
Rooftop mounted steel, coax cable stealth screen
walls above existing penthouse of a 5 story building.
Project: |
9702 |
Name: |
Sprint Cellular
Site |
|
Christ on the
Mountain Church |
Location: |
Lakewood, Colorado |
Owner: |
Sprint Spectrum |
Architect/Engineer: |
Bechtel National |
Contract Amount: |
$247,000 |
Completion Date: |
March, 1997 |
Project Scope:
Construction of a 15’x58’ structural steel and
plaster bell tower at an existing church with concealed antennas behind
stealth panels remote equipment supports and architectural screen walls.
Project: |
9701 |
Name: |
Sprint Cellular
Site |
|
Tri R Recycling |
Location: |
Lakewood, Colorado |
Owner: |
Sprint Spectrum |
Architect/Engineer: |
Bechtel National |
Contract Amount: |
$76,000 |
Completion Date: |
January, 1997 |
Project Scope:
Installation of concrete monoploe antennas, coax
cable and equipment supports.
Project: |
9620 |
Name: |
Sprint Cellular
Site |
|
655 Brodway |
Location: |
Denver, Colorado |
Owner: |
Sprint Spectrum |
Architect/Engineer: |
Bechtel National |
Contract Amount: |
$51,000 |
Completion Date: |
January, 1997 |
Project Scope:
Structural steel framing at rooftop installation
of coax cable, antennas on top of an existing 10 story building.
Project: |
9617 |
Name: |
SOUTH WASTEWATER
TREATMENT PLANT |
|
PARSHALL FLUME |
Location: |
Parker, Colorado |
Owner: |
Parker Water &
Sanitation District |
|
19801 East Main Street |
|
Parker, Colorado
80134 |
Architect/Engineer: |
RG Consulting Engineers |
|
1331 17th
Street, Suite 710 |
|
Denver, Colorado
80202 |
|
Mr. Ken Keil |
Contract Amount: |
$47,958 |
Completion Date: |
January, 1997 |
Project Scope:
The construction of a 24" concrete parshall flume
with nested 12" fiberglass flume and flow measuring device.
Project: |
9616 |
Name: |
WATER SHOP WELL |
Location: |
Brighton, Colorado |
Owner: |
City of Brighton |
|
22 south 4th
Avenue |
|
Brighton, Colorado
80601 |
Architect/Engineer: |
HRS Water Consultants |
|
200 Union Blvd.,
Suite 200 |
|
Lakewood, Colorado
80228 |
|
Mr. Eric Saenger |
|
303/989-2837 |
Contract Amount: |
$226,755 |
Completion Date: |
April, 1996 |
Project Scope:
The construction of a new well and pipeline to
increase the City’s potable water supply. The project included a well house
building which encloses the well pump (200 HP, 1,300 GPM), controls, and
approximately 900 linear feet of underground 12" supply piping.
Project: |
9613 |
Name: |
JUST-IN-TIME CHEM
DELIVERY SYSTEM |
Location: |
Littleton, Colorado |
Owner: |
Lockheed Martin Astronautics |
|
P.O. Box 179 |
|
Denver, Colorado
80201 |
Contract Amount: |
$108,851 |
Completion Date: |
October, 1996 |
Project Scope:
Move a nitric acid tank, with associated piping,
to a new containment area in a different location. The work includes demolition,
dirtwork, concrete work, asphalt, paving, stainless piping, miscellaneous
metals, electrical, and special coating.
Project: |
9612 |
Name: |
A/C STRUCTURES
LAB |
Location: |
Littleton, Colorado |
Owner: |
Lockheed Martin Astronautics |
|
P.O. Box 179 |
|
Denver, Colorado
80201 |
Contract Amount: |
$44,840 |
Completion Date: |
October, 1996 |
Project Scope:
Install a new air conditioning unit with associated
ductwork in an existing work area. The work included demolition, installation
of new RTU, roofing, ductwork, temperature control, and electrical.
Project: |
9611 |
Name: |
GLENDALE SPLASH
WALL REPLACEMENT |
Location: |
Glendale, Colorado |
Owner: |
City of Glendale
Waste Water Treatment Plant |
|
4360 East Virginia
Avenue |
|
Glendale, Colorado |
Architect/Engineer: |
Black & Veatch |
|
11900 East Cornell
Avenue, Suite 300 |
|
Aurora, Colorado
80014 |
|
Ms. Anne Childs |
|
303/671-4285 |
Contract Amount: |
$46,504 |
Completion Date: |
October, 1996 |
Project Scope:
The replacement of the existing masonry aeration
splash walls with concrete splash walls.
Project: |
9608 |
Name: |
US WEST OFFICE
BUILDING ADDITION |
Location: |
Englewood, Colorado |
Owner: |
US West NewVector
Group, Inc. |
|
7028 South Clinton
Street |
|
Englewood, Colorado
80014 |
Architect/Engineer: |
Perlmutter Associates,
P.C. |
|
14001 E. Iliff, suite
415 |
|
Aurora, Colorado
8014 |
|
Mr. John Yancey |
Contract Amount: |
$297,598 |
Completion Date: |
December, 1996 |
Project Scope:
The construction of a 2,916 square foot addition
to the second floor of the existing building, including new interior stairs,
new exterior stair landing and new roofing to the north of the second floor
addition.
Project: |
9604 |
Name: |
MILE HIGH STADIUM
IMPROVEMENTS |
Location: |
Denver, Colorado |
Owner: |
City of Denver |
|
200 West 14th
Avenue |
|
Denver, Colorado
80204 |
Architect/Engineer: |
LONCO, Inc. |
|
1380 Lawrence Street,
Suite 1100 |
|
Denver, Colorado
80204 |
|
Mr. Alex Able |
|
303/620-0098 |
Contract Amount: |
$1,507,674 |
Completion Date: |
December, 1996 |
Project Scope:
Construction, renovation, and repairs to the vomitories,
ramps, concourses, restrooms, patching of concrete surfaces, steel stairs,
decks, sealing of cracks, resurface of parking lots, extending plumbing,
replacing electrical, mechanical items, coating of deck surfaces, painting
and related work.
Project: |
9601 |
Name: |
WIDEFIELD AERATION
SYSTEM |
Location: |
Colorado Springs,
Colorado |
Owner: |
Widefield Homes Water
Company |
|
37 Widefield Blvd. |
|
Colorado Springs,
Colorado 80911 |
|
Mr. Mark Watson,
President |
Architect/Engineer: |
Richard P.Arber Associates,
Inc. |
|
1128 Grant St. |
|
Denver, Colorado
80203-2302 |
|
Mr. Hsui-Ming Jean |
Contract Amount: |
$240,680 |
Completion Date: |
April, 1996 |
Project Scope:
The construction of a blower bldg., including
the installation of blower equip.& fire bubble diffusers,also includes
new instrumentation controls, site work & yard piping.
Project: |
9519 |
Name: |
GAS STATION LINER
REPLACEMENT |
Location: |
Littleton, Colorado |
Owner: |
Lockheed Martin Astronautics |
Address: |
P.O. Box 179 |
|
Denver, CO 80201 |
Contract Amount: |
$60,854 |
Completion Date: |
September 1995 |
Project Scope:
Install protective liner for the fuel storage containment
structure and trench at the Inventory Gas Station.
Project: |
9503 |
Name: |
RELOCATE PAB ENGINE
GENERATOR |
Location: |
Denver, Colorado |
Owner: |
City and County of
Denver |
|
Department of Public
Works |
|
303 West Colfax Ave. |
|
Denver, Colorado
80204 |
|
(303)640-5415 |
|
Mr. Dick Nystrom |
Architect/Engineer: |
City and County of
Denver |
|
Department of Public
Works |
|
303 West Colfax Ave. |
|
Denver, Colorado
80204 |
Contract Amount: |
$363,859 |
Completion Date: |
September 1995 |
Project Scope:
Relocation of existing emergency generator to the
7th floor existing emergency generator room. Install: bi-fold
security doors at parking garage entrance and exit; crash gates at the
street level entrance and exit; and identification card reader access system
and controlling devices.
Project: |
9502 |
Name: |
DENVER WELLS D-1,
D-13 AND D-15 |
Location: |
Highlands Ranch,
Colorado |
Owner: |
Centennial Water
& Sanitation District |
|
62 West Plaza Drive |
|
Highlands Ranch,
CO 80126 |
|
(303) 791-0436 |
Architect/Engineer: |
CH2M Hill |
|
6060 S. Willow Drive |
|
Englewood, Colorado
80110 |
|
(303) 771-0900 |
|
Mr. Courtney Hemenway |
Contract Amount: |
$225,829 |
Completion Date: |
June, 1995 |
Work with Own
Forces: |
40% (Concrete, piping) |
Project Scope:
Project provides Centennial Water and Sanitation
District with three operating wells. Placement of precast concrete equipment
pads at each well, installation of valve vault, piping and valves at well
no. 13 and electrical systems and instrumentation at all three wells.
Project: |
9404 |
Name: |
1993 PLAYGROUND
PROJECTS |
|
MISCELLANEOUS
IMPROVEMENTS |
Location: |
Aurora, Colorado |
Owner: |
City of Aurora |
|
1470 S. Havana St. |
|
Aurora, Colorado
80012 |
|
(303) 695-7340 |
|
Ms. Brenda Agner,
C.P.M. |
Architect/Engineer: |
City of Aurora |
|
1470 S. Havana St. |
|
Aurora, Colorado
80012 |
|
(303) 695-7160 |
|
Mr. John Sawatzki |
Contract Amount: |
$56,180 |
Completion Date: |
October, 1994 |
Work with Own
Forces: |
60% (Demolition,
concrete) |
Project Scope:
Place concrete in portions of existing playgrounds
and replace concrete in poor condition at various playground locations
in Aurora.
Project: |
9403 |
Name: |
MARKET STREET
& CIVIC CENTER STATIONS |
|
WATERPROOFING
AND HVAC UPGRADES |
Location: |
Denver, Colorado |
Owner: |
Regional Transportation
District |
|
1600 Blake St. |
|
Denver, Colorado
80202 |
|
(303) 299-2215 |
|
Mr. Jim Barber, Purchasing
Agent |
Architect/Engineer: |
ABS Consultants,
Inc. |
|
1123 Auraria Parkway,
Suite 400 |
|
Denver, Colorado
80204 |
|
(303) 623-6200 |
Contract Amount: |
$1,260,462 |
Completion Date: |
November, 1994 |
Work with Own
Forces: |
40% (Demolition,
concrete) |
Project Scope:
Waterproof and replace landscaping materials in
planter and sodded areas, repair and/or replace selected areas of plaza
and driveway paving and waterproofing and repair fountains and reflecting
pool, including plumbing and electrical fixtures.
Project: |
9402 |
Name: |
1993 PLAYGROUND
IMPROVEMENT PROJECTS |
Location: |
Aurora, Colorado |
Owner: |
City of Aurora, Colorado |
|
1470 S. Havana St. |
|
Aurora, Colorado
80012 |
|
(303) 695-7340 |
|
Ms. Brenda Agner,
C.P.M. |
Architect/Engineer: |
City of Aurora, Colorado |
|
1470 S. Havana St. |
|
Aurora, Colorado
80012 |
|
(303) 695-7160 |
|
Mr. John Sawatzki |
Contract Amount: |
$321,258 |
Completion Date: |
May, 1995 |
Work with Own
Forces: |
60% (Demolition,
concrete) |
Project Scope:
Demolish and remove of existing main play structures
at various parks in Aurora. Replace play equipment with modular type equipment
with access for the physically handicapped.
Project: |
9316 |
Name: |
WELL AND APPURTENANCES
FOR JFK GOLF COURSE |
|
EXPANSION |
Location: |
Denver, Colorado |
Owner: |
City and County of
Denver |
|
Board of Water Commissioners |
|
1600 W. 12th
St. |
|
Denver, Colorado
80254 |
|
(303) 628-6624 |
|
Mr. John Gaborek |
Architect/Engineer: |
City and County of
Denver |
|
Board or Water Commissioners |
|
1600 W. 12th
St. |
|
Denver, Colorado
80254 |
|
(303) 628-6624 |
|
Mr. John Gaborek |
Contract Amount: |
$105,036 |
Completion Date: |
March, 1994 |
Work with Own
Forces: |
40% (Piping, equipment
installation) |
Project Scope:
Drill well and install well pump and motor.
Project: |
9314 |
Name: |
CROKE CANAL -
RALSTON CREEK CROSSING |
Location: |
Arvada, Colorado |
Owner: |
City of Arvada |
|
8101 Ralston Rd. |
|
Arvada, Colorado
80002 |
|
(303) 431-3033 |
|
Mr. Patrick Dougherty |
Architect/Engineer: |
Jehn & Associates |
|
5695 Yukon Street,
Suite C |
|
Arvada, Colorado
80002 |
|
(303) 423-6036 |
|
Mr. David Moore |
Contract Amount: |
$570,175 |
Completion Date: |
April, 1994 |
Work with Own
Forces: |
60% (Demolition,
concrete, install equipment) |
Demolish existing structure and replace with concrete
box culvert, low flow channels, flood walls, and motorized gate structures.
The work included, stream diversion, concrete, excavation, electrical and
landscaping. Furnish and install six gate structures.
Project: |
9312 |
Name: |
CONDUIT 143 P.R.V.
VAULT |
Location: |
Denver, Colorado |
Owner: |
City and County of
Denver |
|
Board of Water Commissioners |
|
1600 W. 12th
St. |
|
Denver, Colorado
80254 |
|
(303) 628-6631 |
|
Mr. Martin Garcia |
Architect/Engineer: |
City and County of
Denver |
|
Board or Water Commissioners |
|
1600 W. 12th
St. |
|
Denver, Colorado
80254 |
|
(303) 628-6631 |
|
Mr. Martin Garcia |
Contract Amount: |
$312,924 |
Completion Date: |
March, 1994 |
Work with Own
Forces: |
60% (Concrete, piping,
equipment installation) |
Project Scope:
Construct cast-in-place concrete vault, furnish
and install steel pressure pipe, valves and actuators, hydraulic and other
control equipment.
Project: |
9309 |
Name: |
SOIL FILTER BED |
Location: |
Aurora, Colorado |
Owner: |
Havana Water &
Sanitation District |
|
6200 S. Syracuse
Way |
|
Englewood, Colorado
80111 |
|
(303) 779-4525 |
|
Mr. Lew Short |
Architect/Engineer: |
Rocky Mountain Consultants,
Inc. |
|
8301 E. Prentice
Ave., Suite 101 |
|
Englewood, Colorado
80111 |
|
(303) 741-6000 |
|
Mr. Mark Klee |
Contract Amount: |
$24,960 |
Completion Date: |
June, 1993 |
Work with
Own Forces: |
40% (Equipment and
media installation) |
Project Scope:
Excavate soil filter bed and install filter material
and air header piping.
Project: |
9305 |
Name: |
SPRINGHILL IRRIGATION
PUMP INSTALLATION |
Location: |
Aurora, Colorado |
Owner: |
City of Aurora |
|
1470 S. Havana St. |
|
Aurora, Colorado
80012 |
|
(303) 695-7100 |
|
Mr. Barry Dunbar |
Architect/Engineer: |
City of Aurora |
|
1470 S. Havana St. |
|
Aurora, Colorado
80012 |
|
(303) 695-7100 |
|
Mr. Barry Dunbar |
Contract Amount: |
$31,900 |
Completion Date: |
July, 1993 |
Work with Own
Forces: |
60% (Equipment removal
and installation) |
Project Scope:
Remove existing 20 HP motor and starter and install
new 50 HP motor and submersible pump.
Project: |
9304 |
Name: |
CONCRETE WALL
OUTDOOR RACQUET COURTS |
Location: |
Boulder, Colorado |
Owner: |
City of Boulder,
Colorado |
|
1101 Arapahoe Ave.,
Suite 302 |
|
Boulder, Colorado
80306 |
|
(303) 441-3401 |
|
Ms. Ingrid Hutson |
Architect/Engineer: |
City of Boulder/Parks
& Recreation |
|
P.O. Box 791 |
|
Boulder, Colorado
80306 |
|
(303) 441-3436 |
|
Mr. Drew Horton |
Contract Amount: |
$167,252 |
Completion Date: |
August, 1993 |
Work with Own
Forces: |
40% (Concrete
work) |
Project Scope:
Construct concrete wall with block/brick veneer
outdoor racquetball/squash courts and tennis practice wall. Install fencing,
drainage systems and conduit for future lighting.
Project: |
9303 |
Name: |
FT. LUPTON WELL
MODIFICATIONS |
Location: |
Ft. Lupton, Colorado |
Owner: |
City of Ft. Lupton |
|
130 S. McKinley Ave. |
|
Ft. Lupton, Colorado
80621 |
|
(303) 857-6694 |
|
Mr. Robert Alberts |
Architect/Engineer: |
Black & Veatch |
|
1400 S. Potomac Street,
Suite 200 |
|
Aurora, Colorado
80012 |
|
(303) 671-4200 |
|
Mr. Lee Robbins |
Contract Amount: |
$382,131 |
Completion Date: |
February, 1994 |
Project Scope:
Redevelop six municipal water wells: install vertical
diffusion vane well pumps, flowmeters and check valves; replace and modify
piping; upgrade and modify electrical and instrumentation.
Project: |
9301 |
Name: |
ZONE 2 BUTTERFLY
VALVE INSTALLATION |
Location: |
Aurora, Colorado |
Owner: |
East Cherry Creek
Valley Water & Sanitation District |
|
4343 S. Buckley Rd.,
Suite 300 |
|
Aurora, Colorado
80015 |
|
(303) 693-3800 |
|
Mr. Joe Knopinski |
Architect/Engineer: |
Meurer & Associates,
Inc. |
|
143 Union Blvd.,
Suite 600 |
|
Lakewood, Colorado
80228 |
|
(303) 985-3636 |
|
Mr. Paul Goldfain |
Contract Amount: |
$58,540 |
Completion Date: |
April, 1993 |
Work with Own
Forces: |
60% (Concrete work,
equipment |
Project Scope:
Furnish and install 30" butterfly valves and vault.
Back to Project List
|