BOSCO CONSTRUCTORS, INC.
Projects Completed in the Past Five Years
Water and Wastewater Treatment Facilities
Back to Project List
WATER AND WASTEWATER TREATMENT FACILITIES
Project: |
9718 |
Name: |
South Adams County
WWTP Wxpansion Phase I |
Location: |
Commerce City, Coilorado |
Owner: |
South Adams county
Water & Sanitation District |
Architect/Engineer: |
Black & Veatch
11900 East Cornell Avenue, |
|
Suite 300 |
|
Aurora, Colorado
80014 |
|
Mr. Wil Koger |
Contract Amount: |
$799,68081 |
Completion Date: |
Februray 1998 |
Project Scope:
Construct a new influent channel structure with
a rel.ocated manual bar screen and a new parshall flume on the east side
of the existing screen and meter building. Construct a new flow diversion
box and 30 inch ductile iron raw wastewater line fron the box to the new
influent channel. Insatll a mechanical bar filter screen in the screen
and meter building and extend conveyor influent channel. Remove 3 raw wastewater
pumps and associated pipe and electrical drives on the raw wastewater pumping
station and replace them with 4 new AFD-driven submersible pumps and associated
piping and control. Modify the main splitter box, downstream from the primary
clarifers, and the plant potalbe water system. Construct a raised platform
in the screen and neter building for two potable water hydroneumatic tanks.
Furnish and install new HVAC system for the screen and meter building and
raw wastewater pumping station.
Project: |
9619 |
Name: |
LYONS WATER AND
WASTEWATER TREATMENT PLANTS |
Location: |
Lyons, Colorado |
Owner: |
Town of Lyons |
|
PO Box 49 |
|
Lyons, Colorado 80540 |
Architect/Engineer: |
RBD, Inc. |
|
209 South Meldrum
Street |
|
Fort Collins, Colorado
80521 |
|
Mr. John Clark, P.E. |
Contract Amount: |
$1,443,381 |
Completion Date: |
June 1997 |
Project Scope:
Upgrade existing water and wastewater plants. Site
work includes modifications to ponds, yard pipe and grading. Plant work
includes process pipe equipment systems and removal and replacement of
diversion structures as well as additional concrete structures.
Project: |
9615 |
Name: |
MERDIAN LAKE LIFT
STATION |
Location: |
Crested Butte, Colorado |
Owner: |
The Gallin Company |
|
PO Box 2301 |
|
Crested Butte, Colorado
81224 |
Contract Amount: |
$45,000 |
Completion Date: |
December 1996 |
Project Scope:
Install sewage lift station and force main. The
work included lift station, mechanical and pipeline, along with a stand
by generator.
Project: |
9610 |
Name: |
SAGEPORT WATER
TREATMENT PLANT |
Location: |
Larkspur, Colorado |
Owner: |
Perry Park Water
& Sanitation District |
|
5676 West Red Rock
Drive |
|
Larkspur, Colorado |
Architect/Engineer: |
Rothberg, Tamburini
& Winsor |
|
19 North Tejon Street,
Suite 202 |
|
Colorado Springs,
Colorado 80903 |
|
Ms. Lacey Goetz,
P.E. |
|
719/520-5999 |
Contract Amount: |
$420,000 |
Completion Date: |
December 1996 |
Project Scope:
The construction of a new water treatment plant;
two vertical backwash pumps, static mixer, dual train (50 gpm each) package
treatment plant, chemical feed systems, chlorine disinfection equipment.
Project: |
9609 |
Name: |
MERIDAN LAKE -
MT. CRESTED BUTTE |
Location: |
Crested Butte, Colorado |
Owner: |
Mt. Crested
Butte Water and Sanitation District |
|
100 Gothic Road |
|
Mt. Crested Butte,
Colorado 81224 |
Architect/Engineer: |
RBC/Sears Brown Group |
|
2460 West 26th
ave., #46C |
|
Denver, Colorado
80222 |
|
Mr. Greg Woodward |
|
303/458-5526 |
Contract Amount: |
$605,000 |
Completion Date: |
December 1996 |
Project Scope:
The construction of a small water filtration plant
including yard piping, wet well and structure and steel water tank with
concrete pad.
Project: |
9607 |
Name: |
MORRISON WATER
TREATMENT FILTER REHABILITATION |
Location: |
Morrison, Colorado |
Owner: |
Town of Morrison |
|
P.O. Box 95 |
|
Morrison, Colorado
80465 |
Architect/Engineer: |
WRC Engineering |
|
950 South Cherry
Street, Suite 404 |
|
Denver, Colorado
80222 |
|
Mr. Alan Leak |
|
303/757-8513 |
Contract Amount: |
$16,300 |
Completion Date: |
July 1996 |
Project Scope:
The construction of the removal and on-site disposal
of the existing filter media; pressure washing of the filter basin and
underdrain; testing and visual inspection of the underdrain; repair or
replacement of the underdrain as needed; replacement of the filter media;backwashing
of new filter and preparing the rehabilitated filter unit for service.
Project: |
9606 |
Name: |
GENEVA GLEN CAMP |
Location: |
Indian Hills, Colorado |
Owner: |
Geneva Glen Camp |
|
5793 South Santa
Clara Road |
|
Indian Hills, Colorado |
Architect/Engineer: |
Waste Engineering,
Inc. |
|
2430 Alcott Street |
|
Denver, Colorado
80221 |
|
Mr. Scott Marshall |
|
303/433-2788 |
Contract Amount: |
263,227 |
Completion Date: |
April 1997 |
Project Scope:
The construction of the new wastewater treatment
system to replace existing septic system. The work included earthwork,
piping, pond liner installation, electrical and control systems.
Project: |
9605 |
Name: |
BONNY LAKE WASTEWATER
TREATMENT PLANT |
Location: |
Idalia, Colorado |
Owner: |
Colorado State Division
of Parks and Outdoor
Recreation |
|
South Region Office |
|
2128 North Weber |
|
Colorado Springs,
Colorado 80907 |
Architect/Engineer: |
Colorado State Parks |
|
2128 North Weber |
|
Colorado Springs,
Colorado 80907 |
|
Mr. Wayne McCormick |
|
719/471-0900 |
Contract Amount: |
Unit Cost Contract |
Completion Date: |
July 1996 |
Project Scope:
The construction of sewer treatment pumps and lines.
Project: |
9524 |
Name: |
GOLDEN FILTER
IMPROVEMENTS |
Location: |
Golden, Colorado |
Owner: |
The City of Golden |
|
1445 Tenth Street |
|
Golden, Colorado
80401 |
Architect/Engineer: |
TST, Inc. of Denver |
|
102 Inverness Terrace
East, Suite 105 |
|
Englewood, Colorado
80112 |
|
Mr. Bob Takeda |
Contract Amount: |
676,150.38 |
Completion Date: |
April 1997 |
Project Scope:
Removal of existing filter media from 4 22’x16’
filter basins, installation of an air scouring system, replacement of filter
valves, controls and filter media. Re-build plate settler system, install
mixers in the pre-treatment, install trac vac system, re-pipe backwash
system, miscellaneous alterations to yard piping, install water metering
vault at headworks.
Project: |
9523 |
Name: |
NIWOT WASTEWATER
TREATMENT PLANT EXPANSION |
Location: |
Niwot, Colorado |
Owner: |
Niwot Sanitation
District |
|
7960 Niwot Road,
Unit B-2E |
|
Niwot, CO 80544 |
Architect/Engineer: |
Rocky Mountain Consultants |
|
8301 E. Prentice
Ave, Suite 101 |
|
Englewood, CO 80111 |
|
303/741-6000 |
|
Mr. Mark Klee |
Contract Amount: |
$1,361,970 |
Completion: |
May 1996 |
Project Scope:
Construct modifications to existing 1.5 MGD lagoon
based wastewater treatment plant. Modify existing lagoon embankments; add
fine bubble aeration equipment; install mechanical sludge removal equipment;
install return activated sludge and waste sludge pumps. Construct sludge
digester basin and new mechanical building. Remodel existing building to
house laboratory facilities. Install yard piping to make a complete operational
system.
Project: |
9521 |
Name: |
CANON CITY WTP
MEDIA REPLACEMENT |
Location: |
Canon City, Colorado |
Owner: |
City of Canon City |
|
612 Royal Gorge Boulevard |
|
Canon City, Colorado
81212 |
Architect/Engineer: |
The Engineering Company |
|
2310 East Prospect
Road |
|
Fort Collins, Colorado
80525 |
|
Ms. Terry Howes,
P.E. |
Contract Amount: |
$263,202 |
Completion Date: |
February 1996 |
Project Scope:
Remove and replace filter media and backwash troughs.
Project: |
9521 |
Name: |
GLENDALE WASTEWATER
TREATMENT PLANT HEADWORKS RENOVATION |
Location: |
City of Glendale,
Colorado |
Owner: |
City of Glendale |
|
4360 East Virginia
Avenue |
|
Glendale, Colorado
80222 |
Architect/Engineer: |
Black and Veatch |
|
11900 East Cornell
Avenue, Suite 300 |
|
Aurora, Colorado
80014 |
|
Ms. Anne Childs,
P.E. |
Contract Amount: |
$168,458 |
Completion Date: |
April, 1996 |
Project Scope:
Renovate headworks: remove and replace existing
grit collection system, and add new grit handling system.
Project: |
9517 |
Name: |
WASTEWATER TREATMENT
PLANT EXPANSION |
Location: |
Lafayette, Colorado |
Owner: |
City of Lafayette |
|
1290 South Public
Road |
|
Lafayette, Colorado
80026 |
Architect/Engineer: |
McLaughlin Water
Engineers, Ltd. |
|
2420 Alcott Street |
|
Denver, Colorado
802111 |
|
(303)458-5550 |
|
Mr. Rob Anderson |
Contract Amount: |
$568,854 |
Completion Date: |
February 1996 |
Project Scope:
Construct primary pipe modifications, convert biotower
and abandoned basin to a nitrification tower and settling basin.
Project: |
9515 |
Name: |
WASTEWATER TREATMENT
FACILITY IMPROVEMENTS |
Location: |
Genesee, Colorado |
Owner: |
Genesee Water &
Sanitation District |
|
17301 W. Colfax Avenue,
Suite 220 |
|
Golden, Colorado
80401 |
Architect/Engineer: |
Jacobson Helgoth
Consultants, Inc. |
|
65 S. Union Boulevard,
Suite 550 |
|
Lakewood, Colorado
80111 |
|
(303)986-0733 |
|
Mr. Mark Hefta |
Contract Amount: |
$1,361,290 |
Completion Date: |
March 1996 |
Project Scope:
Construct addition to Process Building, clarifiers,
RAS and WAS pumps, electrical and controls and site work. Construct Backwash
Pump Structure with pumps, non-potable water pumps, electrical and instrumentation.
Project: |
9514 |
Name: |
WASTEWATER TREATMENT
FACILITY IMPROVEMENTS |
Location: |
Littleton, Colorado |
Owner: |
Roxborough Park Metropolitan
District |
|
6222 North Roxborough
Park Rd. |
|
Littleton, Colorado 80125(303)979-7286 |
Architect/Engineer: |
Rocky Mountain Consultant’s
Inc. |
|
8301 E. Prentice
Ave.,Ste 101 |
|
Englewood, Colorado
80111 |
|
(303)741-6000 |
|
Mr. Bill Goetz |
Contract Amount: |
$1,769,447 |
Completion Date: |
February 1996 |
Work with Own
Forces: |
60% (Concrete work,
installation of equipment, |
|
associated piping) |
Project Scope:
Construct new headwork, chemical storage and handling
building, chlorine contact basin, and modify existing aeration system.
Project: |
9506 |
Name: |
SEWAGE TREATMENT
PLANT UPGRADES, PHASE II |
Location: |
Golden, Colorado |
Owner: |
Kaiser-Hill/RMRS |
|
P.O. Box 464 |
|
Golden, Colorado
80402 |
|
Mr. Rich Deborski |
Architect/Engineer: |
Kaiser-Hill/RMRS |
|
Rocky Flats |
|
P.O. Box 464 |
|
Golden, Colorado
80402 |
Contract Amount: |
$1,448,053 |
Completion Date: |
March 1, 1996 |
Project Scope:
Addition to existing Wastewater Treatment Plant:
laboratory, restrooms, offices, meeting rooms, expanded pumping/controls
building, larger electrical controls, and site work
Project: |
9410 |
Name: |
SOUTH WASTEWATER
TREATMENT PLANT EXPANSION & MODIFICATIONS |
Location: |
Parker, Colorado |
Owner: |
Parker Water &
Sanitation District |
|
P.O. Drawer 700 |
|
Parker, Colorado
80134 |
|
(303)841-4627 |
|
Mr. Frank Jaeger |
Architect/Engineer: |
RG Consulting Engineers |
|
1331 17th
Street, Suite 710 |
|
Denver, Colorado
80202 |
|
(303)293-8107 |
|
Mr. Ken Keil |
Contract Amount: |
$938,107 |
Completion Date: |
November199 |
Work with Own
Forces: |
60% (Concrete work,
installation of equipment, associated piping) |
Project Scope:
Construct Advanced Wastewater Treatment Building
with reinforced concrete foundations, floor slabs, masonry walls, steel
joists, metal roof deck and a ballasted membrane roof system. Perform concrete
work, general trades work and mechanical portions of contract. Modify yard
piping to tie in to existing aeration tank, influent pump AWT building
decant pit, dewatering pit, and a force main. New backwash tank constructed.
Project: |
9408 |
Name: |
WASTEWATER TREATMENT
PLANT EXPANSION AND WATER SYSTEM IMPROVEMENTS |
Location: |
Cripple Creek, Colorado |
Owner: |
City of Cripple Creek |
|
335 E. Bennett Ave. |
|
Cripple Creek, Colorado
80813 |
|
(719) 689-2502 |
Architect/Engineer: |
GMS, Inc. |
|
611 North Weber,
Suite 300 |
|
Colorado Springs,
Colorado 80903 |
|
(719) 475-2935 |
|
Mr. Roger Sams |
Contract Amount: |
$1,181,072 |
Completion Date: |
April, 1995 |
Work with Own
Forces: |
60% (Concrete work,
installation of equipment, associated piping) |
Project Scope:
350 GPM wastewater treatment plant expansion: install
influent screening and flow measurement equipment, return and waste activated
sludge control system, construct office, laboratory, operations and chemical
feed areas. Perform site work, install prefabricated metal building, roofing,
plumbing, treatment equipment, HVAC and electrical work.
Project: |
9407 |
Name: |
FOUNTAIN VALLEY
WATER TREATMENT PLANT CHLORINE SCRUBBER IMPROVEMENTS |
Location: |
Fountain, Colorado |
Owner: |
Fountain Valley Authority |
|
13250 Ray Nixon Road |
|
Fountain, Colorado
80817 |
|
(719) 636-5915 |
|
Mr. David Cross |
Architect/Engineer: |
CH2M Hill |
|
6060 South Willow
Drive |
|
Greenwood Village,
Colorado 80111 |
|
(303) 771-0900 |
|
Ms. Jane Fisher |
Contract Amount: |
$175,782 |
Completion Date: |
December, 1994 |
Work with Own
Forces: |
40% (Concrete work,
installation of equipment, associated piping) |
Project Scope:
Install new chlorine scrubber system including:
miscellaneous structural, mechanical, electrical and instrumentation and
control modifications.
Project: |
9406 |
Name: |
UPPER MONUMENT
CREEK WASTEWATER TREATMENT FACILITY DENITRIFICATION IMPROVEMENTS |
Location: |
Monument, Colorado |
Owner: |
Gleneagle Water &
Sanitation District |
|
15850 Holbein |
|
Colorado Springs,
Colorado 80921 |
|
(719) 488-3603 |
|
Mr. Bill Nance |
Architect/Engineer: |
Martin/Martin, Inc. |
|
4251 Kipling Street |
|
Wheat Ridge, Colorado
80033 |
|
(303) 431-6100 |
|
Mr. Roger Smades |
Contract Amount: |
$723,366 |
Completion Date: |
January, 1995 |
Work with Own
Forces: |
60% (Concrete work,
installation of tanks and equipment, associated piping) |
Project Scope:
Construct complete denitrification facility with
concrete filter tanks and masonry building. Install filter equipment, methanol
feed equipment, yard and interior piping, manhole and lift station, complete
electrical and controls, and landscaping.
Project: |
9405 |
Name: |
CAUSTIC SODA SYS.
@ MARSTON WATER TREATMENT PLANT |
Location: |
Denver, Colorado |
Owner: |
City and County of
Denver |
|
Board of Water Commissioners |
|
1600 W. 12th
Ave. |
|
Denver, Colorado
80254 |
|
(303) 628-6655 |
|
Mr. David Stone |
Architect/Engineer: |
City and County of
Denver |
|
Board of Water Commissioners |
|
1600 W. 12th
Ave. |
|
Denver, Colorado
80254 |
|
(303) 628-6655 |
|
Mr. David Stone |
Contract Amount: |
$239,000 |
Completion Date: |
November, 1994 |
Work with Own
Forces: |
60% (Concrete work,
installation of tanks and equipment, associated piping) |
Project Scope:
Construct a chemical storage and feed system, remove
and replace lift out roof sections and roof repair. Construct concrete
walls, floor slabs and stairway; install three reinforced fiberglass tanks,
two transfer pumps, two sump pumps and piping for a complete system.
Project: |
9401 |
Name: |
BETASSO WASTEWATER
TREATMENT PLANT FILTER MEDIA REPLACEMENT |
Location: |
Boulder, Colorado |
Owner: |
City of Boulder |
|
1777 Broadway |
|
Boulder, Colorado
80306 |
|
(303) 441-3401 |
|
Ms. Ingrid Hutson |
Architect/Engineer: |
City of Boulder |
|
P.O. Box 791 |
|
Boulder, Colorado
80306 |
|
(303) 441-3242 |
|
Ms. Anne Noble |
Contract Amount: |
$492,135 |
Completion Date: |
May, 1994 - On Schedule |
Work with Own
Forces: |
60% (Media removal
and replacement) |
Project Scope:
Remove existing filter bed material from 8 filters
of a 50 MGD Water Treatment Plant. Install six layers of mixed media in
each filter. Place 1300 tons of media hydraulically and pneumatically through
a specialized system developed for this project. Re-pipe surface wash arms
with new brass piping to inhibit corrosion. Close coordination with plant
personnel required. Project completed with no interruption of plant operations,
and ahead of an accelerated schedule.
Project: |
9315 |
Name: |
CUCHARA WASTEWATER
TREATMENT PLANT |
Location: |
Cuchara, Colorado |
Owner: |
Cuchara Sanitation
& Water District |
|
18721 State Highway
12 |
|
La Veta, Colorado
81055 |
|
Mr. Greg Culbreath |
Architect/Engineer: |
GMS, Inc. |
|
611 N. Weber, Suite
300 |
|
Colorado Springs,
Colorado 80903 |
|
(719) 475-2935 |
|
Mr. Ed Meyer |
Contract Amount: |
$1,569,862 |
Completion Date: |
January, 1995 |
Work with Own
Forces: |
60% (Process piping,
equipment installation, interior finish) |
Project Scope:
Construct .175 MGD Wastewater Treatment Plant:
excavation, yard piping, manholes, vaults, yard structures, and dewatering
and interior finish. Install associated equipment for complete operational
system.
Project: |
9311 |
Name: |
CENTRAL WATER
TREATMENT PLANT |
Location: |
Monument, Colorado |
Owner: |
Woodmoor Water &
Sanitation District |
|
P.O. Box 1407 |
|
Monument, Colorado
80132 |
|
(719) 488-2525 |
|
Mr. Phil Steininger |
Architect/Engineer: |
Rothberg, Tamburini
& Winsor, Inc. |
|
1600 Stout Street,
Suite 1800 |
|
Denver, Colorado
80202 |
|
(303) 825-5999 |
|
Mr. Bob Orsatti |
Contract Amount: |
$1,129,464 |
Completion Date: |
November, 1994 -
On Schedule |
Work with Own
Forces: |
60% (Process piping,
equipment installation, concrete work) |
Project Scope:
Construct complete operational water treatment
facility: concrete masonry block building, dual 400 GPM package treatment
units, chemical feed systems, chlorine equipment, high service discharge
pumps, associated piping, valves and appurtenances.
Project: |
9310 |
Name: |
DIGESTER REHABILITATION |
Location: |
Commerce City, Colorado |
Owner: |
S. Adams County Water
& Sanitation Dist. |
|
6595 E. 70th
Ave. |
|
Commerce City, Colorado
80037 |
|
(303) 288-2646 |
|
Mr. Larry Ford |
Architect/Engineer: |
Black & Veatch |
|
1400 S. Potomac St.,
Suite 300 |
|
Aurora, Colorado
80012 |
|
(303) 671-4200 |
|
Mr. Wil Koger |
Contract Amount: |
$58,699 |
Completion Date: |
October, 1993 - On
Schedule |
Work with Own
Forces: |
60% (Process piping,
equipment installation, repair work) |
Project Scope:
Rehab secondary digester at the Williams-Monaco
Wastewater Treatment Facility West Plant: remove, repaint, reinstall and
test digester cover, adjust gas pressure/vacuum-relief valve, replace part
of draw off gas piping, and replace lower guides. Inspect ballast blocks
and replace heated sludge return lines. Remove existing trickling filter
rotary distributor and reinstall after repair work to distributor bearing.
Project: |
9308 |
Name: |
EAST WATER TREATMENT
PLANT MODIFICATIONS |
Location: |
Aspen, Colorado |
Owner: |
City of Aspen, Colorado |
|
130 S. Galena Street |
|
Aspen, Colorado 81611 |
|
(303) 920-1004 |
|
Mr. Chris Caruso |
Architect/Engineer: |
Schmueser Gordon
Meyer, Inc. |
|
118 West 6th
Street, Suite 200 |
|
Glenwood Springs,
Colorado 81601 |
|
(303) 945-1004 |
|
Mr. Louis Meyer |
Contract Amount: |
$569,803 |
Completion Date: |
October, 1993 - On
Schedule |
Work with Own
Forces: |
60% (Concrete work,
process piping, equipment installation) |
Project Scope:
Remove filter under drain tiles and repair leaks
in existing concrete walls and slabs. Install filter media and construct
a chlorine storage building including electrical controls and process piping
modifications.
Project: |
9307 |
Name: |
COPPER MOUNTAIN
HEADWORKS IMPROVEMENTS |
Location: |
Copper Mountain,
Colorado |
Owner: |
Copper Mountain Water
& Sanitation Dist. |
|
P.O. Box 3002 |
|
Copper Mountain,
Colorado 80443 |
Architect/Engineer: |
Rothberg, Tamburini
& Winsor |
|
1600 Stout St., Suite
1800 |
|
Denver, Colorado
80202 |
|
(303) 825-5999 |
|
Mr. Darwin Dyck |
Contract Amount: |
$93,976 |
Completion Date: |
October, 1993 - On
Schedule |
Work with Own
Forces: |
60% (Demolition,
concrete work, equipment installation) |
Project Scope:
Install automatic barscreen and compactor/conveyor
equipment, water and electrical connections, with demolition to facilitate
equipment installation.
Project: |
9306 |
Name: |
CRIPPLE CREEK
WASTEWATER TREATMENT PLANT EXPANSION, SCHEDULE A |
Location: |
Cripple Creek, Colorado |
Owner: |
City of Cripple Creek,
Colorado |
|
Box 430 |
|
Cripple Creek, Colorado
80813 |
|
(719) 598-2502 |
Architect/Engineer: |
GMS, Inc. |
|
611 N. Weber, Suite
300 |
|
Colorado Springs,
Colorado 80903 |
|
(719) 475-2935 |
|
Mr. Roger Sams |
Contract Amount: |
$699,000 |
Completion Date: |
September, 1993 |
Work with Own
Forces: |
60% (Concrete work,
process piping, equipment installation) |
Project Scope:
Add aeration system, two clarifiers, chlorination
and dechlorination systems, pumps, piping systems and appurtenances to
existing plant. Construct concrete blower building; install three blowers
with piping, instrumentation and controls; and remove existing system.
Install two clarifiers with concrete foundations, pumps and piping system
and concrete chlorine contact basin with inlet and outlet structures and
chemical feed system. Work coordinated with the Owner to continue plant
operations during all phases of work and was substantially complete in
three months.
Back to Project List
|